Perimeter PPR BREVENNE TURDINE
Description
This class describes any perimeter delineating an area influenced by the presence of a PPR. The boundaries thus defined are of an official nature and shall be effective from a defined date.
• Prescribed perimeter contained in the prescription order of a PPR (natural or
technological)
• Scope of exposure to risks that corresponds to the scope regulated by the RPP
approved. This approved perimeter is public utility easement (PM1 for PPRNs)
and PM3 for PPRTs)
• Scope of study corresponds to the envelope in which the hazards were studied
Resources
| Name |
Format |
Description |
Link |