Description
The data include information on planned and current jobs of longer and shorter duration outside motorways in North Rhine-Westphalia. Specifically, the publication includes the following information (if available):
- Period of construction
- Type of construction
- Sections concerned
- Length of construction work
- Maximum permissible speed
- If necessary: Temporary limitation of the width of the carriageway
- If necessary: Weight restriction
- If necessary: Number of lanes closed
- If necessary: Additional information
The data are collected by the respective developers as part of the cross-departmental coordination.
Resources
| Name | Format | Description | Link |
|---|---|---|---|
| XML | Open resource |