FCR N and D, Frequency Containment Reserves, DK2
Description
Frequency Containment Reserve - Normal operation/-Disturbance, FCR N and D, also called primary reserve, is there to stabilize the frequency in the electricity grid in DK2 and in the rest of the Nordic synchronous area, in the event of a frequency dip/jump.
Energinet procures FCR-N, FCR-D up and FCR-D down capacity reserve in collaboration with Svenska Kraftnät in daily auctions where part of the required volume is procured two days before the day of operation, D-1 early (former D-2) and the remaining part is procured the day before the day of operation, D-1 late (former D-1).
For further information, please see:
* [Balancering og systemydelser](https://energinet.dk/el/balancering-og-systemydelser/)
* [Ancillary Services](https://en.energinet.dk/electricity/balancing-and-ancillary-services/)
Prices of FCR regulation before July 2023 is available here [FCR, Frequency Containment Reserves, DK2](https://www.energidataservice.dk/tso-electricity/FcrReservesDK2).
**Caution:** UTC/CET timestamps are incorrect at the end of daylight saving time 2024:
* Correct: HourUTC 2024-10-27 00.00 = HourDK 2024-10-27 02.00 (incorrect in dataset: HourUTC 2024-10-27 01.00 = HourDK: 2024-10-27 02.00)
* Correct: HourUTC 2024-10-27 01.00 = HourDK 2024-10-27 02.00 (incorrect in dataset: HourUTC 2024-10-27 01.01 = HourDK: 2024-10-27 02.01)
Resources
| Name |
Format |
Description |
Link |
|
23 |
|
https://api.energidataservice.dk/dataset/FcrNdDK2 |
|
8 |
|
http://data.europa.eu/88u/dataset/energidataservice_77_fcrnddk2~~1 |
|
21 |
|
http://data.europa.eu/88u/dataset/energidataservice_77_fcrnddk2~~1 |
|
23 |
|
http://data.europa.eu/88u/dataset/energidataservice_77_fcrnddk2~~1 |
|
54 |
|
http://data.europa.eu/88u/dataset/energidataservice_77_fcrnddk2~~1 |
Tags
- balance-i-elnettet
- energidata
- energistatistik
- elforsyning
- systemydelser
- balance-i-elsystemet
- elektricitet
- energi
- elforsyningsstatistik
- el