Economic Impact of Permitting Timelines on Produced Geothermal Power

Description

Despite having a large geothermal power potential in the United States, only a small fraction has been developed for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to lower contribution of geothermal energy in the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. This study shows that the geothermal permitting timelines can vary from six months to several years, depending on the presence or absence of biological resources, cultural resources, and sensitive environmental issues at the project site. The potential impacts of these permit barriers can range from investors abandoning geothermal development to making the product (i.e., electricity) more expensive and uncompetitive.

Resources

Name Format Description Link
57 Supporting documents for the final technical report by Neupane and Adhikari. Includes calculations and reports for various geothermal sites as well as an overarching calculation spreadsheet. https://gdr.openei.org/files/1369/Supportingf%20files_Economic%20Impact%20of%20Permitting%20Timelines%20on%20Produced%20Geothermal%20Power.zip
33 "Economic Impact of Permitting Timelines on Geothermal Power in California, Nevada, and Utah" outlines the technical barriers brought on by environmental reviews and permitting timelines. https://gdr.openei.org/files/1369/Final%20tech%20report_INL-NTB_Neupane_Adhikari_2022.pdf
33 Proceeding paper- Stanford Geothermal Workshop 2022. Outlines how unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that cause delays in geothermal exploration and utilization plans. https://gdr.openei.org/files/1369/Neupane.pdf

Tags

  • report
  • salton-sea-geothermal
  • nepa
  • barriers
  • cove-fort-geothermal
  • permitting-timelines
  • salt-wells-geothermal
  • non-technical
  • timelines
  • permit
  • permitting
  • ceqa
  • truckhaven-geothermal
  • geothermal
  • energy

Topics

Categories