Mom-ERGOM western Baltic Sea simulations with tagging of phosphorus inputs of the Warnow River, base scenario, v05 Unterwarnow turnover

Description

A marine physical Biogeochemical model simulation was performed with the model MOM-ERGOM for the years 1995 to 2014 covering the Baltic Sea. Previously, MOM-ERGOM had been initialised for several decades without tagging until 1984 and, then, from 1985 to 1994 with tagging (see below). The model output has been validated with measurement data of the “IOW Baltic Monitoring and long-term data program” (https://www.io-warnemuende.de/iowdb.html; IOW: Leibniz Institute for Baltic Sea Research Warnemünde) and from the HELCOM database (http://ocean.ices.dk/helcom/Helcom.aspx; HELCOM: Helsinki Commission). The model simulation was forced by coastDat2 COSMO-CLM data (doi:10.1594/WDCC/coastDat-2_COSMO-CLM). Riverine phosphorus input of the Warnow River was calculated with the Soil & Water Assessment Tool (SWAT; Bauwe et al., 2019, doi:10.1016/j.ecohyd.2019.03.003). Phosphorus from the Warnow River has been tagged in the model simulation according to a method by Menésguen et al. (2006, doi:10.4319/lo.2006.51.1_part_2.0591). So, all phosphorus-containing model variables exist twice in the output: once as regular variables and once as tagged variable. The default phosphorus input by the Warnow River based on real phosphorus release patterns and real atmospheric conditions was used (PhosWaM SWAT case “is”). The turnover of phosphorus compounds in the Unterwarnow was calculated on the “Unterwarnow turnover estimation v05” (see final project report of PhosWaM for details). The simulation was performed at the North-German Supercomputing Alliance (HLRN). The model output data were processed and evaluated on servers provided by the project ‘PROSO — Processes of trace substances in the Baltic Sea’ (FKZ 03F0779A).

Resources

Name Format Description Link

Tags

  • biogeochemical-cycle
  • ergom
  • ocean-simulation
  • mom

Topics

Categories