dphase_lamepsat: Aladin-Austria Ensemble system run by ZAMG for the MAP D-PHASE project
Description
Model system
Aladin, 18 km horizontal resolution, 37 levels in vertical, LOPEZ Microphysics etc.
Ensemble system with 16 members.
2 runs per day at 00, 12 UTC,
Initial perturbation: Downscaling of ECMWF Singular vector perturbation
Lateral boundary perturbation: Coupling with the ECMWF EPS system
Domain of products: Latitude: 38.53---54.98, 0.15 deg grid space, 110 grids;
Longitude: 2.55---31.8, 0.15 deg. grid space, 196 grids
Every 3 hours, from 0 to 48 hours forecast.
Grid description:
Quadratic grid, it is the Lambert Projection
DDOM: xfirst: 2.55 yfirst: 42.95 xsise: 105.0 ysise: 49.0 xinc: 0.15 yinc: 0.15 xnpole: 0.0 ynpole: 0.0
Resources
| Name |
Format |
Description |
Link |
Tags
- model-data
- regional-model-forecast