DC fast charging stations that do not meet NEVI but within 1-mile of a corridor March 2024

Description

Locations of DC fast charging stations that do not meet NEVI power-level or port count requirements (as of March 2024) but are within 1-mile of a corridor.

A data dictionary is available at https://afdc.energy.gov/data_download/alt_fuel_stations_format. 

Resources

Name Format Description Link
21 https://cecgis-caenergy.opendata.arcgis.com/datasets/CAEnergy::dc-fast-charging-stations-that-do-not-meet-nevi-but-within-1-mile-of-a-corridor-march-2024
3 https://services3.arcgis.com/bWPjFyq029ChCGur/arcgis/rest/services/DC_fast_charging_stations_do_not_meet_1mi_requirement_March2024/FeatureServer/0
57 https://cecgis-caenergy.opendata.arcgis.com/api/download/v1/items/4bf092fb5c69474694dced3f3cabe5b0/shapefile?layers=0
25 https://cecgis-caenergy.opendata.arcgis.com/api/download/v1/items/4bf092fb5c69474694dced3f3cabe5b0/kml?layers=0
8 https://cecgis-caenergy.opendata.arcgis.com/api/download/v1/items/4bf092fb5c69474694dced3f3cabe5b0/csv?layers=0
15 https://cecgis-caenergy.opendata.arcgis.com/api/download/v1/items/4bf092fb5c69474694dced3f3cabe5b0/geojson?layers=0

Tags

  • caopendata
  • california-energy-commission
  • california-natural-resources-agency
  • nevi
  • ftd

Topics

Categories