Data Files for “The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure"

Description

This data set includes modeling results from “The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure” including region-specific [i.e., national, state, and core-based statistical area (CBSA)—cities/towns] electric vehicle supply equipment (EVSE) port count requirements in 2025 and 2030 for multiple scenarios described in the study. Please cite as: Wood, E., B. Borlaug, M. Moniot, D.-Y. Lee, Y. Ge, F. Yang, and Z. Liu. 2023. The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure. Golden, CO: National Renewable Energy Laboratory. NREL/TP-5400-85654.

Resources

Name Format Description Link
5 Modeled state EVSE port count requirements (CBSA-level resolution) in 2025 and 2030 for multiple scenarios described in the study https://data.nrel.gov/system/files/214/1686093513-state_cbsa-2030ncn-results.zip
5 Modeled national EVSE port count requirements (state-level resolution) in 2025 and 2030 for multiple scenarios described in the study https://data.nrel.gov/system/files/214/1686093513-national_state-2030ncn-results.zip

Tags

  • ev
  • evse
  • transportation
  • ev-charging
  • light-duty-vehicle
  • infrastructure
  • electric-vehicle

Topics

Categories