Centipod WEC, Advanced Controls, Resultant LCOE

Description

Project resultant levelized cost of energy (LCOE) model after implementation of model predictive control (MPC) controller. Contains annual energy production (AEP) data, cost breakdown structure (CBS), model documentation, and the LCOE content model. This is meant for comparison with this project's baseline LCOE model.

Resources

Name Format Description Link
AEP Resultant MPC.xlsx XLS Annual Energy Production - Combines mechanical power matrix with a Northern California resource Joint Probability Distribution (JPD) and losses to produce AEP for the resultant LCOE. Open resource
CBS Resultant MPC.xlsx XLS Cost Breakdown Structure - Contains all cost assumptions for Installed Capital Cost and Operations & Maintenance Cost for WEC. Open resource
LCOE Content Model Resultant.xlsx XLS LCOE Content Model for the resultant LCOE calculated within this submission. Open resource
LCOE Model Documentation.docx Doc A description of the LCOE model and the files contained here which comprise it. Open resource
LCOE Resultant MPC.xlsx XLS An excel document combining the outputs of AEP and CBS for final resultant LCOE calculation implementing the MPC. Open resource
Baseline LCOE Submission HTML This links to MHKDR Submission 70, the baseline LCOE model after implementation of MPC controller. Contains AEP, CBS, model documentation, and LCOE content model. This is meant for comparison with the resultant LCOE model of this submission 71. Open resource
Centipod WEC Final Technical Report HTML Final Technical Report describing project parameters, organization, task activities, accomplishments, and conclusions. Open resource

Tags

Topics

Categories