Centipod WEC, Advanced Controls, Baseline LCOE

Description

Project baseline levelized cost of energy (LCOE) model for the Centipod WEC containing annual energy production (AEP) data, a cost breakdown structure (CBS), model documentation, and the LCOE content model. This baseline was built for comparison with the resultant LCOE model, built after implementation of the model predictive control (MPC) controller.

Resources

Name Format Description Link
53 An excel document combining the outputs of AEP and CBS for final LCOE calculation. https://mhkdr.openei.org/files/70/LCOE-Baseline.xlsx
10 A description of the LCOE model and the files contained here which comprise it. https://mhkdr.openei.org/files/70/LCOE%20Model%20Documentation%5B1%5D.docx
53 LCOE Content Model for the baseline LCOE calculated within this submission. https://mhkdr.openei.org/files/70/LCOE%20Content%20Model%20v1.1%20-%20Centipod-SPAI-Baseline.xlsx
53 Cost Breakdown Structure - Contains all cost assumptions for Installed Capital Cost and Operations & Maintenance Cost for WEC. https://mhkdr.openei.org/files/70/CBS-Baseline.xlsx
21 This links to MHKDR Submission 71, the resultant LCOE model after implementation of MPC controller. Contains AEP, CBS, model documentation, and LCOE content model. This is meant for comparison with the baseline LCOE model of this submission 70. https://mhkdr.openei.org/submissions/71
53 Annual Energy Production - Combines mechanical power matrix with a Northern California resource Joint Probability Distribution (JPD) and losses to produce AEP for the baseline LCOE. https://mhkdr.openei.org/files/70/AEP-Baseline.xlsx
21 Final Technical Report describing project parameters, organization, task activities, accomplishments, and conclusions. https://mhkdr.openei.org/submissions/75

Tags

  • wave-energy
  • cost-of-energy
  • cost
  • converter
  • dehlsen
  • hydrokinetic
  • northern-california
  • annual-energy-production
  • advanced
  • baseline
  • mhk
  • point
  • controls
  • wave
  • centipod
  • point-absorber
  • lcoe
  • wec
  • multiple
  • mpc
  • cbs
  • marine
  • levelized-cost-of-energy
  • point-absorber-buoy
  • power
  • multi-pod
  • aep
  • absorber
  • cost-breakdown-structure
  • economics
  • model-predictive-control
  • energy

Topics

Categories