Description
Hydropower generation per connection to the electricity grid per month.
More information on how to access the data:
https://www.cbs.nl/nl-nl/onze-diensten/maatwerk-en-microdata/microdata-zelf-onderzoek-doen
Methodology
Data comes from CertiQ and assessed by CBS for plausibility. CBS may have made corrections. There’s little. For the publication, only connections with a capacity greater than 0.1 megawatts count. See also the annual publication Renewable Energy in the Netherlands yyyy.
Population
All installations for the production of hydroelectric power connected to the electricity grid and registered with CertiQ. CertiQ is a subsidiary of national network operator TenneT.
Resources
| Name | Format | Description | Link |
|---|