Carlsbad Irrigation District Monthly Average Water Allotment Feet per Acre Time Series Data

Description

Averaged monthly time series for modeled water allotment for Carlsbad Irrigation District in feet of water per acre of land. Results were modeled using the Pecos River Operations Model (PROM) for the purpose of the Pecos River Basin Study. This study used data from five downscaled and bias-corrected Global Climate Models (GCMs) run through a Variable Infiltration Capacity (VIC) hydrological model. Outputs at key headwater and tributary gages were then used as inputs and run through a RiverWare operations model, PROM. There are ten runs for each GCM which includes: a baseline run, five alternate management strategy runs, and four water footprint runs.

Resources

Name Format Description Link
21 Landing page for "Carlsbad Irrigation District Monthly Average Water Allotment Feet per Acre Time Series Data" https://data.usbr.gov/catalog/4387/item/10885
21 RISE time series query interface with the output for "Carlsbad Irrigation District Monthly Average Water Allotment Feet per Acre Time Series Data" selected. Provides an interactive plot of the data and downloads of machine-readable data and plot images. https://data.usbr.gov/time-series/output?lo=3587&it=10885&id=20100101-20991201

Tags

  • future-projections
  • basin-study
  • water-modeling
  • alternate-strategies

Topics

Categories