Total load of non-performance customers 2018 (Berlin)

Description

The total load of non-performance-measured customers (Rest Load) 2015 is the load cycle of the sum of all withdrawal points of the standard load profile customers (SLP customers) as ¼ h performance values.The load cycle of the residual load is based on the following calculation: Residual load = network load — network losses — withdrawal load of performance-measured customers. The load cycle over time is shown here.

Resources

Name Format Description Link
8 https://www.stromnetz.berlin/globalassets/dokumente/veroffentlichungspflichten/2018/summenlast-nicht-leistungsgemessene-kunden-2018.csv

Tags

  • stromnzv_par._17
  • restlast
  • slp-last
  • entnahmelast_leistunggemessener_kunden
  • veröffentlichungspflichten_nach_stromnzv
  • nicht_leistungsgemessene_kunden

Topics

  • ENER

Categories