Secured routes

Description

The main route (certified section of road) is a road or road connection, the operation of which is to be secured on the back-up route. Coverage: roads, ramps. The ELY Centres are responsible for maintaining the information. The target category is versioning. A more detailed description of the process/roles/responsibilities: https://ava.vaylapilvi.fi/ava/Publications/Vaylavirasto/vo_2020-55_reserve route plans_laadinta_web.pdf

Resources

Name Format Description Link
0 https://www.avoindata.fi/data/dataset/c8c3fe2e-992d-46e3-b3f2-1ad870ca9303/resource/3911a9a5-3da3-48c0-8670-4069657593aa
0 https://www.avoindata.fi/data/dataset/c8c3fe2e-992d-46e3-b3f2-1ad870ca9303/resource/95db2b40-5649-4e8a-9fef-2eb50abe0b83
0 https://www.avoindata.fi/data/dataset/c8c3fe2e-992d-46e3-b3f2-1ad870ca9303/resource/05894ed7-40f3-436e-bc63-dd9e4f208a60
0 https://www.avoindata.fi/data/dataset/c8c3fe2e-992d-46e3-b3f2-1ad870ca9303/resource/ab5ee0fe-489d-4247-953e-e5b7a3c7cbee

Tags

  • varautumiseen-liittyvat-luokitukset
  • liikenne
  • velho
  • avoindata.fi
  • ei-inspire

Topics

Categories