CAGDB - NE Thelon (Uranium North) - Block A

Description

This airborne or shipborne geophysical survey recorded the following parameters: Total Field Magnetic, Radiometric. The flight line spacing is 200 m for a total of 3214 kilometres. The survey was flown between 2007-08-16 and 2007-09-27. The data were Digitally acquired. Platform: Fixed-wing.

Resources

Name Format Description Link
Download data and grids in various file formats, English application Unknown http://gdr.agg.nrcan.gc.ca/gdrdap/dap/index-eng.php?db_project_no=403&db_project_part=15
Download data and grids in various file formats, French application Unknown http://gdr.agg.nrcan.gc.ca/gdrdap/dap/index-fra.php?db_project_no=403&db_project_part=15

Tags

Topics

Categories