Barometric pressure time series from August 15, 2011, to October 11, 2011, from the wellhouse for Floridan aquifer system monitoring well FA-4 at the North District Wastewater Treatment Plant, Miami-Dade County, Florida

Description

U.S. Geological Survey, in cooperation with Miami-Dade County, performed a sequential, aquifer stress test from August 15 to October 12, 2011, on the Floridan aquifer system at the North District Wastewater Treatment Plant, in Miami-Dade County, Florida. Miami-Dade County stressed the Floridan aquifer system with four municipal injection wells at the North District. The U.S. Geological Survey measured barometric pressure with a Baro TROLL 500 from August 15, 2011, to October 11, 2011, in the wellhouse for Floridan aquifer system monitoring well FA-4. These data are part of a larger data set that describe the stress test at the North District (King, 2016, http://dx.doi.org/10.5066/F7QZ2819).

Resources

Name Format Description Link
55 The metadata original format https://data.usgs.gov/datacatalog/metadata/USGS.56991b32e4b0fbd3f7fa4d4d.xml
55 Landing page for access to the data http://dx.doi.org/10.5066/F7QZ2819

Tags

  • underground-injection-control
  • aquifer-test
  • tomography
  • usgs-56991b32e4b0fbd3f7fa4d4d
  • effluent-injection
  • deepwell-injection
  • hydrogeology
  • florida
  • miami-dade

Topics

Categories