August 2006 Probable Minimum 24-Month Study

Description

The Probable Minimum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor Park, Blue Mesa, Morrow Point, Crystal, Vallecito, Navajo, Powell, Hoover Dam - Lake Mead, Davis Dam - Lake Mohave, and Parker Dam – Lake Havasu. Operations were projected using Reclamation’s 24-Month Study RiverWare model with the Probable Minimum unregulated inflow projections provided by the National Weather Service’s Colorado Basin River Forecast Center. The Probable Minimum inflow scenario reflects a dry hydrologic condition which statistically would be exceeded only 90% of the time.

Resources

Name Format Description Link
RISE Item Details Page URL for "August 2006 Probable Minimum 24-Month Study" HTML Landing page for "August 2006 Probable Minimum 24-Month Study" Open resource
PDF File for "August 2006 Probable Minimum 24-Month Study" PDF "August 2006 Probable Minimum 24-Month Study" as a PDF file Open resource

Tags

Topics

Categories