Name |
Format |
Description |
Link |
|
53 |
Pre-run checklist, run protocols, and post-run checklist |
https://mhkdr.openei.org/files/3/Test%20Protocols%20%2811-26-2013%29.xlsx |
|
33 |
Top Port Assembly Drawing |
https://mhkdr.openei.org/files/3/Top%20Port%20Assembly.pdf |
|
53 |
Mooring Line Lengths |
https://mhkdr.openei.org/files/3/Line%20Lengths.xlsx |
|
33 |
Top Starboard Assembly Drawing |
https://mhkdr.openei.org/files/3/Top%20Starboard%20Assembly.pdf |
|
33 |
Lateral Assembly Drawing |
https://mhkdr.openei.org/files/3/Lateral%20Assembly.pdf |
|
33 |
Full Rig Assembly Drawing |
https://mhkdr.openei.org/files/3/Full%20Rig%20Assembly.pdf |
|
33 |
Basin Layout Drawing |
https://mhkdr.openei.org/files/3/Basin%20Layout.pdf |
|
53 |
Results from captured test, dynamic check-out,
and dynamic test. Notes included |
https://mhkdr.openei.org/files/3/Test%20Matrix%20%28hs_11-27-2013%29.xlsx |
|
53 |
Includes weights and centers summary, keel specs, buoyancy pod specs, and summary specs. Calculations included |
https://mhkdr.openei.org/files/3/Single%20Rotor%20Model%20Configuration%20%28hs%2010-21-2014%29.xlsx |
|
10 |
C-Plane tow test plan including summary, schedule, technical approach, model and test set-up, captured test, moored test, and results |
https://mhkdr.openei.org/files/3/Aquantis%20Tow%20Tank%20Test%20Plan%20%28hs_KG_%2011-13-2013%29.docx |
|
10 |
Aquantis tow tank dynamic rig final assembly process with CAD drawings |
https://mhkdr.openei.org/files/3/Aquantis%20Tow%20Tank%20Dynamic%20Rig%20Assembly%20Process%20-%20tjm%20092913.docx |
|
33 |
CAD drawing of track support |
https://mhkdr.openei.org/files/3/track%20support%20drawing%20%28tjm%2009_12_13%29.pdf |
|
33 |
Base Port Assembly Drawing |
https://mhkdr.openei.org/files/3/Base%20Port%20Assembly.pdf |
|
53 |
C-plane model configuration, mooring lengths, wing specs, wet weights, CG-CB prototype checkout, CG-CB final baseline, CG-CB final low fr, CG-CB final upwind |
https://mhkdr.openei.org/files/3/C-Plane%20Model%20Configuration%20%28hs%2011-27-2013%29.xlsx |
|
36 |
Tow tanks test dynamic rig CG locations |
https://mhkdr.openei.org/files/3/Tow%20Tank%20Test%20Dynamic%20Rig%20CG.pptx |
|
53 |
Includes log of test with comments, data, basin summary, average Fx, pitch, and configuration notes |
https://mhkdr.openei.org/files/3/TestLog_12.13.2013-DBC.xls |
|
33 |
Base Starboard Assembly Drawing |
https://mhkdr.openei.org/files/3/Base%20Starboard%20Assembly.pdf |
|
53 |
Dynamic Rig BOM for Naval Surface Warfare Center |
https://mhkdr.openei.org/files/3/Dynamic%20Rig%20BOM%20for%20NSWC.xlsx |