Description
This wastewater sampling campaign in the south-east interceptor aimed to determine the acute lethality and the physicochemical quality of the water discharged into the river without treatment during the work carried out on the south-east interceptor between 11 and 14 November 2015.
Resources
| Name | Format | Description | Link |
|---|---|---|---|
| Physico-chemical analysis table in CSV format - Sampling 2015 | CSV | Open resource | |
| Physico-chemical analysis table in MS Excel XLSX format - Sampling 2015 | xlsx | Open resource | |
| Original metadata (https://www.donneesquebec.ca) | HTML | Open resource |