Document containing preliminary installation, operation, and maintenance information from the first deployment. Also included is a development test plan for turbine load/performance testing, anchor-holding capacity validation, system deployment and retrieval testing, composite structural testing and accelerated life testing, composite turbine joint testing, full system verification deployment, and notes on additional testing. |