Priority area flood protection/flood area

Description

The aim of the regional plan is to secure areas that are to be preserved as existing, unbuilt flood areas or which are to be recovered as lost flood areas. These areas shall be kept free of uses which prevent water retention or represent the loss of such areas and cannot be compensated in other areas. Data origin:- Regional Planning Association Oberlausitz-Lower Silesia with legal basis Regional Plan, 1. Overall update (as of 4.2.2010) -Regional Planning Association Oberes Elbtal/Osterzgebirge with legal basis Regional Plan, 1. Overall update (as of 19.11.2009) -Planungsverband Region Chemnitz with legal basis Regional Plan Chemnitz-Erzgebirge, update (as of 31.7.2008) and Regional Plan Southwest Saxony, 1. Overall update (as of 6.10.2011) -Regional Planning Association Leipzig-Westsachsen with legal basis Regional Plan West Saxony 2008 (as of 25.7.2008)

Resources

Name Format Description Link

Tags

  • planung
  • ziel
  • hochwasserschutz
  • regionalplanung
  • planowanie;-planowanie-przestrzenne;-plan-regionalny-;-wykorzystanie-przestrzeni;-wolna-przestrzeń;-obszar-priorytetowy;-obszar-zastrzeżony;-prewencyjna-ochrona-przeciwpowodziowa;-ochrona-przeciwpowodziowa;cel;-retencja-wody
  • freiraum
  • überschwemmungsbereich
  • raumplanung
  • plánování;-územní-plánování;-regionální-plán;-regionální-plánování-vyhoštění;-regionální;-volná-krajina;-povodeň;preventivní-ochrana-před-povodněmi;-prioritní-oblast;-cíl;zadržování-vody;preventivní;u34_1
  • u34_1
  • regionalplan
  • u_34_1
  • vorbeugend
  • vrg
  • vorranggebiet
  • wasserrückhalt
  • regionalplanerische-ausweisung

Topics

  • JUST

Categories