Description
At the hydrological stations, different measurement parameters corresponding to the requirements of the planning approval decision (PfB) for the construction measure "adaptation of the Lower and Outer Elbe to container shipping" are collected. These are the following parameters: Tide water level, runoff, flow, temperature, conductivity, salinity and related derived parameters.
Resources
| Name | Format | Description | Link |
|---|