Addendum 1 to the works contract lot 01 Creation of a ZRDC and renaturation of a tributary of the madon

Description

Addendum 1 to the works contract lot 01 Creation of a ZRDC and renaturation of a tributary of the madon Contract No 2023-WMAOP1 Alloti contract First stage works PAPI MADON Joint and several representative group Authorised representative: TERELIAN 10 rue des carpentiers 57 070 METZ Co-contractor: SETHY 6 rue des weisserands actipôle 57 070 METZ /new address: 10 Carpenters Street 57 070 METZ Co-contractor: GTM TP EST 1 rue de Lisbonne BP 80064 SCHILTIGHEIM 67 012 STRASBOURG CEDEX /new address: 9 rue du Dépôt 67 207 NIEDERHAUSBERGEN Modified holder: GTM TP EST The EPTB concluded on 19 July 2023 a contract with the joint consortium TERELIAN (authorised representative)/SETHY/GTM TP EST relating to the creation of a Dynamic Flood Slowdown Zone (ZRDC) on municipalities of Hymont, Velotte-et-Tatignécourt, Valleroy-aux-Saules & Maroncourt and ecological restoration of a tributary of the Madon. The holder informed the EPTB of the change of address of the co-contractor GTM TP EST (see page 1 of this amendment) resulting in the change of the SIRET number of this company which is now No 818 766 297 00043. Finally, it should be noted that SETHY’s change of address does not change the SIRET number of the company (see page 1 of this addendum) Addendum No 1 notified on 21 October 2024

Resources

Name Format Description Link
33 https://www.data.gouv.fr/api/1/datasets/r/eaa74a8b-463e-4168-ac33-ccbb62e69c5c

Tags

Topics

Categories