Work to extend the Skate Park in two lots to the Vabre sports complex. Lot 02 ‘Concrete skatepark’
Description
This is the extension of the skatepark in Brignoles, comprising two spaces: a street+bowl set and a kidpark area dedicated to children and beginners.
This contract is divided into two lots:
- Lot No 01 ‘Earthworks, HHT and surrounding areas’
- Lot No 02: Concrete Skatepark
The project management mission, launched by the city of Brignoles as part of this operation, was awarded to the consortium CONNEXION SPORT URBAIN (authorised representative) – 1834 route des Tardy – 73170 Saint Pierre d’Alvey and SEIRI (co-contractor) 3970 avenue de Milan – 66000 Perpignan.
The work is described in the Special Technical Specifications (STS) for each lot. The services are listed in the Breakdown of the Global and Fixed Price (D.P.G.F.) for each lot.
CPV classification: 45212200-8 (Sports facility construction work).
Lot 1: 45112500-0 (Earthworks) – 45232100-3 (Supplementary works for water pipes)
Lot 2: 45223220-4 (Large work) 45112500-0 (Earthworks)
Resources
| Name |
Format |
Description |
Link |
|
33 |
|
https://www.data.gouv.fr/api/1/datasets/r/06651d10-f95f-4d3b-b990-b01fbcb2dea0 |