Charging infrastructure for electric vehicles (RAIDEN SAS organisation): BMW MINI — LEGRAND SUD AUTO — LE MANS — 72016
Description
This dataset reference a Cahors FASTEO 50 kW charging station, a Cahors FASTEO 100 kW charging station
This dataset meets the specifications of the diagram “Electric vehicle charging infrastructure” available on the website [schema.data.gouv.fr](https://schema.data.gouv.fr/etalab/schema-irve)
Resources
| Name |
Format |
Description |
Link |
|
8 |
|
https://www.data.gouv.fr/api/1/datasets/r/d32150ba-3fc9-4d76-a985-acf0cf9cb782 |