Description
Data up to 26 September 2022. Location of wind farms from their instruction to the exit of the prefectural decree. Litigation procedures are not taken into account. A wind farm is composed of several wind poles. It corresponds to an administrative entity and refers to an operating company. The proposed geometry is a representation that makes it possible to map small-scale wind turbines but does not correspond to any hold in the field. It complies with the COVADIS 2017 standard. The right-of-way of wind farms is generated by creating a buffer of 500 m around the wind turbines, aggregation and then a reducing buffer of — 300 m.
Resources
| Name | Format | Description | Link |
|---|---|---|---|
| Wind farms granted in Burgundy-Franche-Comté | ESRI Shape | Open resource | |
| Wind farm in Burgundy-Franche-Comté | ESRI Shape | Open resource | |
| Wind farms in Burgundy-Franche-Comté | ESRI Shape | Open resource |