Requirements for the installation of constructions – Polygone d’implantation du PLU-H de la Métropole de Lyon
Description
Geographical perimeter within an area where new constructions must be established. Where a quantified value is entered within the right-of-way of an implantation polygon, the maximum height of facade of the buildings is determined by this value.
For an overall view of the requirements for the installation of buildings, combine all the fiches:
Space not aedificandi
Location line
Continuity/discontinuity
Resources
| Name |
Format |
Description |
Link |
|
15 |
|
https://www.data.gouv.fr/fr/datasets/r/6b4ba699-67c4-49ed-b506-2d1874ad8dee |
|
61 |
|
https://www.data.gouv.fr/fr/datasets/r/b4c4b13f-fe09-4b85-8efd-763043ab360c |
|
8 |
|
https://www.data.gouv.fr/fr/datasets/r/6ed1733b-5261-48bf-9b04-4b262899ed4d |