Requirements for the installation of buildings – Obligation or non-continuity of the PLU-H of the Métropole de Lyon

Description

Mandatory continuity: The structures must be installed in continuous order from one lateral boundary to the other. However, in overall operations, the continuous order of construction may be interrupted if such interruption permits the outlet on a public or private road of the internal service to the proposed operation. Attribute TYPEPLU = CONTINU Discontinuity mandatory The constructions must be installed in discontinuous order. Attribute TYPEPLU = discontinuous For an overall view of the requirements for the installation of buildings, combine all the fiches: Space not aedificandi Location line Implantation polygon

Resources

Name Format Description Link
8 https://www.data.gouv.fr/fr/datasets/r/2fdf84a0-9f61-4b13-8b19-79ad79860ff8
15 https://www.data.gouv.fr/fr/datasets/r/e43101f5-eb0d-4843-9146-5dfd09d64436
61 https://www.data.gouv.fr/fr/datasets/r/0bcf1e02-1b59-45d9-8d03-461fbceac38d

Tags

Topics

Categories