Requirements for the installation of buildings – Obligation or non-continuity of the PLU-H of the Métropole de Lyon

Description

Mandatory continuity:
The structures must be installed in continuous order from one lateral boundary to the other. However, in overall operations, the continuous order of construction may be interrupted if such interruption permits the outlet on a public or private road of the internal service to the proposed operation.
Attribute TYPEPLU = CONTINU

Discontinuity mandatory
The constructions must be installed in discontinuous order.
Attribute TYPEPLU = discontinuous

For an overall view of the requirements for the installation of buildings, combine all the fiches:
Space not aedificandi
Location line
Implantation polygon

Resources

Name Format Description Link
Unknown Resource ESRI Shape Open resource
Unknown Resource CSV Open resource
Unknown Resource GeoJSON Open resource

Tags

Topics

Categories