Northwest Greater Toronto Area transmission corridor study area

Description

Get mapping data related to the Northwest Greater Toronto Area Transmission Corridor Identification Study. In June 2019, the Ministry of Energy, Northern Development and Mines along with Ontario’s electricity system planner, the Independent Electricity System Operator, launched the Northwest GTA Transmission Corridor Identification Study to identify an appropriate corridor of land for use by future power lines if and when the need arises.

Resources

Name Format Description Link
Original metadata (https://data.ontario.ca) HTML Open resource
2020: Narrowed Area of Interest KML Open resource
May 2025: Narrowed area of interest KML Open resource
2024: Proposed Narrowed Area of Interest KML Open resource
2019: Preliminary Transmission Corridor Study Area KML Open resource
April 2026: Narrowed Area of Interest KML Open resource
December 2025: Narrowed Area of Interest KML Open resource
2019: Narrowed Area of Interest KML Open resource
October 2025: Proposed Narrowed Area of Interest KML Open resource
April 2026: Narrowed Area of Interest ESRI Shape Open resource
Original metadata (https://data.ontario.ca/fr) HTML Open resource

Tags

Topics

Categories