Description
Soil markings or klometrification of the Danube Island are located by GPS. The ground markings are located on site at a distance of 500 meters on all paths of the Danube Island, the right Danube dam and the left flood protection dam. By means of the additional designations in the form of letters in front of the kilometer indications it is clearly recognizable on which way the marking is located.
L = left flood protection dam
Lu = left bank of the New Danube
Ru = right bank of the New Danube
without letters = Upper main route of the Danube Island
RT = right stairway of the Danube
LT = left stairway of the Danube
R = right Danube dam Hauptweg
Resources
| Name | Format | Description | Link |
|---|---|---|---|
| WFS GetFeature (CSV) | CSV | Open resource | |
| WFS GetFeature (JSON) | JSON | Open resource | |
| WFS GetFeature (SHP) | ESRI Shape | Open resource | |
| WFS GetFeature (GML) | GML | Open resource | |
| WFS GetCapabilities | Unknown | Open resource | |
| WMS Geoserver GetMap (KMZ) | Unknown | Open resource | |
| WMS Geoserver (KML) | KML | Open resource | |
| WMS Geoserver (GeoRSS) | Unknown | Open resource | |
| WMS Geoserver (GIF) | GIF | Open resource | |
| WMS Geoserver (JPEG) | JPG | Open resource | |
| WMS Geoserver GetMap (PNG) | PNG | Open resource | |
| WMS Geoserver GetMap (SVG) | Unknown | Open resource |