Description
Notified parcels with drainage as a result of new policy (April 2016) regarding the construction of drainage pipes and the construction of irrigation wells.
Resources
| Name | Format | Description | Link |
|---|---|---|---|
| ZIP | Open resource | ||
| PNG | Open resource |
Notified parcels with drainage as a result of new policy (April 2016) regarding the construction of drainage pipes and the construction of irrigation wells.
| Name | Format | Description | Link |
|---|---|---|---|
| ZIP | Open resource | ||
| PNG | Open resource |