Nature management plan, differences Design and views Nature Network Brabant

Description

The Nature Management Plan includes the boundaries of the NNB (Natuur Netwerk Brabant). Changes to this card can take place in 2 ways. [1] With a draft decision, a consultation period, followed by a final decision by way of views. [2] With a Card Adaptation Decision that is immediately final. This map shows differences from [1] Design and views. The April version of this map shows the differences of the Draft Decision, the September version shows the differences of the Draft Decision including views. The differences are compared to the previous definitively adopted version of the NRN limit.

Resources

Name Format Description Link
57 https://atlas.brabant.nl/data_download/shapes/be4fd62e-2315-4b98-a60c-25880d0a3ac8.zip
57 https://atlas.brabant.nl/data_download/geopackage/be4fd62e-2315-4b98-a60c-25880d0a3ac8.zip
57 https://atlas.brabant.nl/data_download/gml/be4fd62e-2315-4b98-a60c-25880d0a3ac8.zip

Tags

  • natuurontwikkeling
  • natuurbeheer
  • ecologie

Topics

Categories