Unfinished works: 1 January 2018 - 31 December 2018

Description

The dataset contains the total data relating to the register of unfinished works collected through a ‘network system’ that integrates the Information System for Monitoring Unfinished Works (SIMOI), of the Ministry of Infrastructure and Transport, and similar systems activated by the Regions and Autonomous Provinces. In particular, the data relating to the autonomous provinces of Trento and Bolzano, collected using autonomous systems, do not complete the basic information path. The data presented relate to the 2018 survey and are generally published on 30 June 2019 on https://www.serviziocontrattipubblici.it/SPInApp/it/works_unfinished.page. The unfinished work status is typically attributable to what is defined in the Ministerial Decree 42/2013 art.1 paragraph 1 and paragraph 2: “(a) the construction works, which have started, are interrupted beyond the contractual deadline for completion; b) the construction works, started, are interrupted within the contractual deadline for completion, as the conditions for restarting them are not present; c) the construction works, completed, have not been tested within the deadline because the work does not meet all the requirements set out in the specifications and the related executive project, as ascertained during the testing operations

Resources

Name Format Description Link
8 https://dati.mit.gov.it/catalog/dataset/3ebd8cd3-7b95-4ac3-a34b-c08c63ebbd8d/resource/b7b62e47-f188-478b-9f9a-7e5a3e2f21e3/download/opere-incompiute-2018.csv
54 https://dati.mit.gov.it/catalog/dataset/3ebd8cd3-7b95-4ac3-a34b-c08c63ebbd8d/resource/dc6894f2-5a7a-48e2-8e96-32471514f201/download/opere-incompiute-2018.xlsx

Tags

  • minf
  • opere
  • interventi

Topics

  • GOVE

Categories