Description
Task 4: Retrofit to State-of-the-Art Report.
Resources
| Name | Format | Description | Link |
|---|---|---|---|
| Lifetime extension of the French 1300 MWe reactor fleet generic requirements for the 4 th periodic safety review. Task 4 | Open resource | ||
| Lifetime extension of the French 1300 MWe reactor fleet generic requirements for the 4 th periodic safety review. Task 4 | Open resource |