Hydrological model of the Guadiamar River. PICOVER Plan. Andalusia
Description
Creation of a hydrological model for the study of the Guadiamar River basin at 1:50,000 scale, within the Guadiamar Green Corridor Research Plan (PICOVER). It contains the variables necessary for the creation of the model, such as the isolines of precipitation accumulated in 24 hours for return periods between 5 and 500 years, exit points of the basin to obtain histograms, location of rain gauges, etc.
Resources
| Name |
Format |
Description |
Link |
Tags
- ideandalucia
- opendata
- hidrología
- hidrografía
- cuencas
- modelos
- restauración