Hydrological model of the Guadiamar River. PICOVER Plan. Andalusia

Description

Creation of a hydrological model for the study of the Guadiamar River basin at 1:50,000 scale, within the Guadiamar Green Corridor Research Plan (PICOVER). It contains the variables necessary for the creation of the model, such as the isolines of precipitation accumulated in 24 hours for return periods between 5 and 500 years, exit points of the basin to obtain histograms, location of rain gauges, etc.

Resources

Name Format Description Link

Tags

  • ideandalucia
  • opendata
  • hidrología
  • hidrografía
  • cuencas
  • modelos
  • restauración

Topics

  • ENVI

Categories