New construction potential on existing transverse structures

Description

Existing transverse structures in Bavaria, which were examined in accordance with the provisions of WHG § 35 (3) for their suitability for hydropower use. According to the result, the examined transverse structures can be assessed as suitable/conditionally suitable or not suitable after completion of the test.

Resources

Name Format Description Link

Tags

Topics

Categories