Spill volumes and durations, south-east interceptor works, Nov. 2015 (archives)

Description

During the month of November 2015, the City of Montreal carried out major maintenance work on the south-east interceptor, which required the latter to be put out of work. The result was a wastewater discharge whose duration and volume were estimated.

Resources

Name Format Description Link
Duration and volumes, tab 2 in CSV format CSV https://donnees.montreal.ca/fr/dataset/274f8e6c-a5ce-4ac3-b893-6ded1ea52b6c/resource/0742f588-6eed-4864-bea6-8c3f3401b4a3/download/deversementdureevolumenov20152.csv
Duration and volumes spilled in Excel format xlsx https://donnees.montreal.ca/fr/dataset/274f8e6c-a5ce-4ac3-b893-6ded1ea52b6c/resource/a1a9f91e-7249-459f-977d-ff5e88023816/download/deversementdureevolumenov2015.xlsx
Duration and volumes, tab 1 in CSV format CSV https://donnees.montreal.ca/fr/dataset/274f8e6c-a5ce-4ac3-b893-6ded1ea52b6c/resource/d281b30c-a8a7-42fb-96d5-960e1163a76f/download/deversementdureevolumenov20151.csv
Original metadata (https://www.donneesquebec.ca) HTML https://www.donneesquebec.ca/recherche/fr/dataset/274f8e6c-a5ce-4ac3-b893-6ded1ea52b6c

Tags

Topics

Categories