Land, road and hydraulic engineering (GWW); input price index 2005 = 100, 2005-2013

Description

This table provides insight into the input price index (2005 = 100) of the costs of labour, materials and equipment for land, road and hydraulic engineering projects (GWW). Eight sub-areas within the GWW are distinguished. These areas are derived from the standard Clasification Products to Activity. For each sub-area, an index series is determined on the basis of the price developments of the different cost components from which the product to be realised – in this case a project in the GWW – is built up. The price index for the Total GWW is a weighted average of the eight sub-areas. The published price indices of the GWW are based on the average price level of the month in question. The composition of this index excludes the changes in overheads and ‘profit & risk’. In addition to price indices, developments are also published compared to one year earlier. Data available from January 2005 to October 2013 Status of the figures: All figures in this series are final. Changes as of 28 February 2014: 2013 figures have been definitively adopted and the table has been discontinued. When will there be new figures? The series based on 2005 = 100 has stopped. This table is followed by price indices for land, road and hydraulic engineering (GWW), 2010 = 100. See paragraph 3.

Resources

Name Format Description Link
23 https://opendata.cbs.nl/statline/#/CBS/nl/dataset/80858ned/table
0 https://opendata.cbs.nl/statline/#/CBS/nl/dataset/80858ned/table

Tags

Topics

Categories