REDIAM. WMS Hydraulic Model of the Guadiamar River 1:50,000 scale within the PICOVER Plan. Year 2001
Description
WMS service corresponding to the creation of a hydraulic model for the study of the Guadiamar basin at 1:50,000 scale, within the Guadiamar Green Corridor Research Plan (PICOVER). It contains the flood limits by maximum estimated avenues for return periods between 50 and 500 years, the definition of the sections of the hydraulic model, or simulations and analysis of stability of the funds for each return period. Information prepared by the Ministry of the Environment in 2001. Node of the Andalusian Environmental Information Network. Regional Government of Andalusia. Integrated in the Spatial Data Infrastructure of Andalusia, following the guidelines of the Cartographic System of Andalusia.
Resources
| Name |
Format |
Description |
Link |
|
0 |
|
http://www.juntadeandalucia.es/medioambiente/mapwms/REDIAM_Desastre_Aznalcollar_Hidraulico_Picover? |
Tags
- rediam
- ideandalucia
- wms
- humaninteractionservice
- andalucía
- cuencas
- modelos
- restauración
- hidráulica